摘要
文章简要论述了三门峡大坝垂直位移监测网的布设与施测 ,以及新布设的垂直位移监测网与原来的大坝垂直位移监测网水准点高程之间的换算关系 ,大坝垂直位移监测网的精度评定与分析。
This paper intreduces the Sanmenxia dam vertical-displacement monitoring network measurement and accuracy analysis,as well as conversion relation of leveling point height between new setting up vertical-displacemtnt monitoring network and primary dam vertical-displacement monitoring network and the dam vertical-displacement monitoring network precision assessment and accuracy analysis.
出处
《东北测绘》
2001年第3期21-22,共2页
Northeast Surveying and Mapping