摘要
针对工程材料库存管理问题 ,提出一个新模型。用经济订购批量来确定材料的最高、最低储备量。简单易行 。
The authors a new model for the problem of material stock in project.According to economy order batch,the highest and lowest storage quantity are made.It's simple.The better economic effect is achieved.
出处
《锦州师范学院学报(自然科学版)》
2001年第2期19-21,共3页
Journal of Jinzhou Normal College (Natural Science Edition)