摘要
介绍了引进的石化联合装置锅炉水处理系统遇到的问题、产生的原因及相关的试验研究 ,提出了优化运行的改进措施 ,取得了较好效果 。
The problems encountered in a water treatment system of the boiler in the imported petrochemical integrated plant are reported. An analysis on the cause of the problems is presented with the measures taken to optimize the operating conditions. Satisfactory results have been obtained.