摘要
本文运用插值方法 ,给出了计算防洪坝根石缺石量的两种计算模型 .
In this paper, using Lagrange′s interpolation and Spline inter polation, we setup two mathematical models to calculate the quantity of prevent flood dyke′s bedrock. These mathematical models can apply to the project of prevent flood.
出处
《数学的实践与认识》
CSCD
北大核心
2001年第5期519-520,共2页
Mathematics in Practice and Theory