本文简要介绍安钢二炼三台小方坯连铸机的情况,高效化改造的原因,采取的主要技术措施,存在的问题以及改造后取得的效果。
This article introduces briefly the basic situation of the three billet CC of The No. 2 Steel Plant of Anyang Iron & Steel Group Co., the reason of high-efficiency modification, the main techniques which have been taken, the problems which have not been solved, and the effects which have been made after the modification.
出处
《连铸》
2001年第4期18-19,共2页
Continuous Casting