5RAUSCHE F. Dysnmic determination of pile capacity[J]. Journal of Geotechnical Engineering Driving ASCE, 1985, 111(3):367-383.
6LUNDBERG B. Microcomputer simulation of percussive drilling[J]. International Journal of Rock Mechanics Mining Science & Geomechanics Abstract, 1985, 22(4): 237-249.