摘要
分析某高层公寓工程在特定条件下应用大直径锤直沉管混凝土灌注桩基础 ,桩基施工的工期缩短。
This paper introduce some successful experiences in using the foundation of the big drameter driven pile- sinking tube to improve benefit and effect from shortening the site hut and saving investment.
出处
《福建建筑》
2001年第B10期49-50,共2页
Fujian Architecture & Construction
关键词
大直径锤击沉管灌注桩
桩基施工
成本控制
Big drameter driven pile-sinking tube,shortening site hut,saving investment,improving benefit and effect