摘要
工程的施工管理 。
An authoritative coordinative setup must be established and a practical completion plan and various energatic management measures must be formulated to guarantee the completion of the construction management architectural engineering
出处
《福建建筑》
2001年第B10期72-73,共2页
Fujian Architecture & Construction
关键词
施工组织
施工管理
交叉施工
施工布署
Construction disposition Plan check Plan adjustment coordinative setup Crossed construction