摘要
在针状焦生产装置中 ,针对延迟焦化炉炉管因严重结焦而堵塞的问题 ,通过对该炉的操作与结构的改进 ,取得了理想的效果。
For the blocking problem of delayed coke oven pipe caused by coke sticking in the needle coke production plant, ideal result has been gained through the improvments of the operation and structure of the oven.
出处
《燃料与化工》
2001年第5期253-255,共3页
Fuel & Chemical Processes
关键词
针状焦
延迟焦化炉
结构
炉管
操作
Needle coke Delayed coke oven Structure improvmemt