期刊文献+

国外工作面高压供电及对我国工作面供电升压的看法(上) 被引量:1

HIGH VOLTAGE SUPPLY ON COAL FACE IN FOREIGN COUNTRIES AND VIEWS ON VOLTAGE ESCALATION OF COAL FACE IN CHINA
下载PDF
导出
摘要 文章介绍了80年代以来,国外日产万吨综采工作面供电技术的发展,列举了国外高产高效工作面机械装备的情况、单机容量、技术特征及其供电电压(2.3~5 kV)。作者结合我国具体情况,根据5点理由,认为我国采区供电升压宜分两步走:第一步先采用3.3kV,第二步再过渡到6kV。 The paper introduces the technique development of power supply on mechanical mining coal face at a daily output of 10000t in foreign countries since 80's, emunerstes the mechanical equipment, the capacity of single machine, the technical feature and the supplying voltage (2.3kV-5kV) of high production high efficiency coal face in these countries. In the light of the specific condition of our country, the paper proposes by reason of five points, the voltage escalation in mining area in our country ought to be taken in two steps, first escalate to 3.3kV and then to 6kV.
作者 耿兆瑞
出处 《煤矿机电》 北大核心 1991年第1期3-8,共6页 Colliery Mechanical & Electrical Technology
  • 相关文献

同被引文献54

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部