期刊文献+

开展聚合物驱项目后评价工作的探讨 被引量:6

DISCUSS ON POST-EVALUATION OF POLYMER FLOODING
下载PDF
导出
摘要 建设项目后评价既是对建设项目从立项、决策、设计、施工到生产运营全过程的总结 ,又是项目管理程序的最终环节。开展聚合物驱项目的后评价工作 ,应从建立和完善后评价方法与参数、研究聚合物驱项目后评价主要内容等方面入手 ,全面总结油田聚合物驱项目管理的经验与教训 ,从而达到提高项目决策水平。 Post evaluation of construction project is a conclusion of the planning, decision, design, operation and production of the project. It is the ultimate step of project management process. The development of post evaluation of polymer flooding should start with constructing and perfecting post evaluation method and parameters and studying the content of the evaluation so as to summarize the experience and problem of the project management of polymer flooding in oil fields and therefore improve the decision level, management level and investment benefit of projects.
出处 《大庆石油地质与开发》 CAS CSCD 2001年第5期50-52,共3页 Petroleum Geology & Oilfield Development in Daqing
关键词 聚合物驱 油藏工程 地面工程 建设项目 后评价 决策水平 投资效益 polymer flooding reservoir engineering surface engineering economy post evaluation
  • 相关文献

参考文献2

二级参考文献1

共引文献140

同被引文献44

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部