期刊文献+

大同煤矿采场坚硬顶板控制方法与工程效果 被引量:13

Controlling Methods and Engineering Effects of Strong Roof in Datong Mining Area
下载PDF
导出
摘要 介绍了坚硬顶板爆破放顶和深孔高压注水压裂弱化顶板的机理,及收到的效果。 With hard rock roof and very hard rock roof, the rock mass in Datong mining area has undeveloped joint, thick slice height, and firm integrality. The roofs are non-collapsed after working, the goafs are unable to pack fully after caving. The unsupported roof is in the state of two-dimensional stress, only one downward free surface existed.It is not only affected by ground stress field but also by gravity field. That's why we adopted the methods of blow down and high-pressure water injection into deep holes to weaken the roof.Very good engineering results have been achieved. This paper has introduced the mechanism of blow clown and high-pressure water injection into deep holes to weaken the roof in detail.
作者 宋永津
机构地区 大同矿务局
出处 《煤炭科学技术》 CAS 北大核心 1991年第12期18-22,共5页 Coal Science and Technology
  • 相关文献

同被引文献92

引证文献13

二级引证文献232

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部