摘要
依据章丘电厂湿陷性地基的数据 ,计算了湿陷性系数和总湿陷量 ,确定了湿陷厚度 ,进而计算得到所需夯击能 ,在此基础上制定强夯方案 ,通过静载试验对强夯法处理后的冷却塔湿陷性地基进行了测试与计算 。
According to the data of collapsible foundation of cooling tower of Zhangqiu Power Plant,collapsible coefficient and overall collapsible value is calculated The collapsed thickness and dynamic compaction energy is gained The compaction plan is given Using static test to the treated collapsible foundation, some test and calculating results are given, which showed that the collapsibility of upside soil layer disappeared