摘要 介绍了一种求解电源与输电线路联合规划的新方法。首先根据联合规划的特点构造了一新的模型 ,然后 ,结合电力系统本身结构特征 ,在联合规划模型中引入了等值节点 ,提出了一个新的求解联合规划方法 ,它可大大降低模型中变量的维数 ,为维数灾问题得到解决探索了一条有效途径。为进一步提高模型的灵活性和实用性 ,又将输电线路传输能力的安全储备系数应用于规划模型。初步仿真计算表明 A new method to study the composite expansion planning of power generation and transmission is preseuted. Based on features of the composite expansion planning, a new mathematical planning model is firstly proposed.And a new decomposition method for solving the composite planning is given by introducing equivalent buses into the planning model and shown as a good way to solve the dimension disaster problem. In addition, in order to make the model more flexible and more practicable, security reserve rates of the transmission capacity of lines are applied to the model. Numerical simulations on a 24 buses test system have been carried out to demonstrate the effectiveness of the proposed model
出处 《现代电力》 2001年第3期61-68,共8页 Modern Electric Power
关键词 电源规划 输电线路 等值法 数学模型 目标函数 Generation planning transmission tine planning equivalent method
  • 相关文献

参考文献11

  • 1[1]David A K, Zhao R D. An Expert System with Fuzzy Sets for Optimal Planning. IEEE Trans. Power Syst.,1991,6(1):59~65.
  • 2[2]Mo B, Hegge J, Wamgensteen I. Stochastic Generation Expansion Planning By Means of Stochastic Dynamic Programming, IEEE Trans. Power Syst. , 1991,6(2) :662~668
  • 3[3]Hadjicostas T P,Adams R N. The Flexible Rolling Schedule for Infinite-Horizon Optimality in Generation Expansion Planning, IEEE Trans. Power Syst., 1992,7(3):1182~1188
  • 4[4]Gorenstin B G, Campodonico N M, Costa J P, Pereira MVF. Power System Expansion Planning under Uncertainty, IEEE Trans. Power Syst. , 1993,8 ( 1 ): 129 ~ 136
  • 5[5]Tanabe R, Yasuda K, Yokoyama R, Sasaki H. Flexible Generation Mix Under Multi Objectives and Uncertainties, IEEE Trans. Power Syst. , 1993,8(2): 581~587.
  • 6[6]Head W J, Nguyen H V, Kahle R L. The Procedure Used To Assess the Long Range Generation and Transmission Resources in the Mid-Continent Area Power Pool, IEEE Trans. Power Syst. , 1990,5(4) :1137~1145
  • 7[7]Li Wenyuan, Billinton R. A Minimum Cost Assessment Method for Composite Generation and Transmission System Expansion Planning. IEEE Trans. Power Syst. , 1993,8(2):628~635.
  • 8[8]Baughman M L, Siddiqi S N, Zarnikau JW,Integrating Transmission into IRP-Part 1:Analytical Approach. IEEE Trans. Power Syst. , 1995,10(3): 1652~ 1659
  • 9[9]Sasaki H,Kubokawa J. Generation Expansion Problem by Means of Multi-Objective Fuzzy Optimiza- tion. Tutorial on Fuzzy Logic Applications in Power Systems, Large Engineering Systems Conference on Power Engineering, Halifax, Nova Scotia, Canada, 1998.42~ 49.
  • 10[10]Xia Q, Song Y H, Kang C Q, Xiang N D. Novel Models and Algorithms for Generation Unit Location Optimization. IEEE Trans. Power Syst. , 1997,12(4): 1584~ 1590