分析了卢浦大桥安装过程中遇到的施工技术关键问题,如现场焊接、临时索塔很高大、多股临时拉索、拱肋安装控制等,并提出了相应的解决措施。
The paper analyzes Lupu Bridge Key technologies for construction met during the installation such as for in-place welding high temporary cable tower, temporary multiplied cord stayed cable as well as control of arch truss installation etc, and raises relative resolution measures.
出处
《上海建设科技》
2001年第5期29-30,共2页
Shanghai Construction Science & Technology
关键词
卢浦大桥
安装
焊接
临时索塔
拱桥
Lupu Bridge bridge deck arch truss installation welding temporany cable tower