摘要
以大亚湾核电站为参考,采用动态仿真和一、二回路闭环的模拟方法,对核电站正常运行中的重要瞬态——机组从100%满功率甩负荷到厂用电运行进行瞬态分析,给出了影响瞬态进程的因素。
Using the methods of dynamic simulation and closed circuit of primary and secondary sys-tems,the transient of house load fro m 100%FP,which is importment transient in the normal operation of nu-clear power plant,is analyzed with r eference to Daya Bay nuclear power pl ant in this paper.Some factors to influence the progress of transient are pointed out.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2001年第5期385-389,共5页
Nuclear Power Engineering
关键词
厂用电运行
动态仿真
瞬态分析
甩负荷
核电厂
核电机组
House load operation
Dynamic simulation
Transient analysis
Load rejection
Nucle-ar power plant