基于岭澳核电站建设期间采用的质量管理模式 ,简要介绍了核电站主要土建施工活动的质量管理过程及土建不符合项的控制过程。文中所阐述的各项质量管理过程多是在吸取大亚湾核电站建设经验的基础上 ,通过岭澳核电工程的具体实践而逐步形成的。
Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the paper briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non conformance control of civil works. These quality control processes described in this paper come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience.
出处
《原子能科学技术》
EI
CAS
CSCD
2001年第6期561-567,共7页
Atomic Energy Science and Technology
关键词
核电站
土建施工
质量管理
nuclear power station
civil construction
quality control