粉喷桩施工的现代质量控制技术

Modern Quality Control Technology in the Construction of Jet Flyash Mixing Piles
下载PDF
导出
摘要 阐述目前我国粉喷桩施工技术的发展现状及存在的问题 ,介绍计算机控制的粉喷钻机基本原理及各参量控制过程 .通过对两种机械施工结果的比较可知 ,由计算机控制施工的粉喷桩 ,桩体各段搅拌均匀 ,含粉量上下基本一致 ,无侧限抗压强度无大的变化 ,其轻便触探N10 可达加固前的 2倍以上 ,施工质量得到有效控制 ,避免普通施工机械施工所造成的上部质量明显好于下部的现象 。 The present situation of and the existing problems in the construction of jet flyash mixing piles in China are enunciated. The basic principles and the parameter control process of the jet drill controlled by computer are introduced. A comparison of the construction by two kinds of machines shows that the jet flyash mixing pile is mixed evenly at every section, that the ash content is almost the same from the top to the bottom, that there is no significant change in unconfined compression strength, and that the number of N 10 blows reaches two times that before consolidation, indicating that the control of construction quality is effective.
作者 阮善发
出处 《水利水电科技进展》 CSCD 2001年第3期51-53,共3页 Advances in Science and Technology of Water Resources
关键词 复合地基 粉喷桩 闭环控制 质量控制 composite foundation jet flyash mixing pile closed loop control
  • 相关文献

参考文献2

二级参考文献1

  • 1[日]福帠正已 编,丁玉琴.最新软弱地基处理方法[M]中国铁道出版社,1988.

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部