The 2nd and 3rd Phases of Construction of the Ninth Waterworks in Beijing
下载PDF
导出
摘要 北京市第九水厂二、三期工程工艺设计中选用了快速机械搅拌混合、推流式波形板水力絮凝、侧向流波形斜板沉淀、均质煤滤料过滤、构筑物密集型集团式布置等新技术及多喷口流量控制阀、快速轴流式机械搅拌器、2 5 5 0kW电压型变频器等新设备。工程运行表明所选用的新技术、新设备高效、安全、节能 ,其中多项属国内首创。 New treatment structures were adopted for the second and third phases construction of the Ninth Waterworks in Beijing,including rapid mechanical mixer, corrugated sheet plug flow hydraulic flocculation chamber, sedimentation tank with lateral corrugated plates and homogeneous coal filters which are laid out in group compactly. Also new devices were adopted. such as multi nozzle flow control valve, high speed axial mechanical agitator and voltage frequency converter of capacity 2 250 kW. The trail operation shows that these new technologies and equipments are high efficient, safety and energy saving, and some of them are advanced worldwide and first time used in this country.
出处 《给水排水》 CSCD 北大核心 2001年第12期1-5,共5页 Water & Wastewater Engineering
  • 相关文献

同被引文献51

引证文献3

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部