摘要
就某高层住宅在首层结构施工完成后,地下室结构混凝土出现质量事故所进行的事故分析、加固方案进行了论述。该加固方案也已完成,其强度和质量完全达到了设计要求。
The articles analyzes and discusses the concrete quality accident and the reinforcement programme of a High-rise Building's basement structure of which the first floor structure Building has been constructed. The intensity and quality of this fufiled reinforcement programme have reached the design requirements.
出处
《河北建筑工程学院学报》
CAS
2001年第3期36-37,46,共3页
Journal of Hebei Institute of Architecture and Civil Engineering