摘要
将约 30 0m长的 # 3皮带机在空间高 2 .2m、宽 2 .8m的栈桥内改造为两条串联的皮带机 ,在中间增加一个油浸式电动滚筒 ,连接处进行土建改造。改造后解决了 # 3皮带机跑偏难纠、检修困难的难题。
#3 belt of about 300 metres high 2.2 metres, wide2.8 metres, in space, modifies into two series belt, adding an immersion electric drum, making construction in connecter. The difficult problem of#3 belt machine, running-bias and overhaul.
出处
《江西化工》
2001年第3期48-50,共3页
Jiangxi Chemical Industry