期刊文献+

天生桥二级电站施工期Ⅱ^#隧洞外水压力观测分析 被引量:2

INTERPRETATION ANALYSIS ON OUTER WATER PRESSURE DURING COUSTRUCTION OF DIVERSION TUNNEL Ⅱ# OF THE SECOND STAGE HYDRO-POWER STATION OF TIANSHENGQIAO
下载PDF
导出
摘要 天生桥二级(坝索)冰电站引水隧洞的主要荷载是外水压力.按设计要求对Ⅱ#,Ⅲ#引水隧洞的外水压力进行监测,将施工期Ⅱ#水隧洞的实测外水压力与推测的外水压力进行比较分析,并对排水洞内排水孔布置和渗压计的埋设提出建议,以供设计参考。 The outer water pressure is the main load on the diversion tunnel of the second stage hydro-power station of Tianshengqiao. According to the design requirement , the outer water pressure is monitored during construction of diversion tunnel Ⅱ # andⅢ #. A comparison analysis is made for the calculated and measured outer water pressures of diversion tunnel Ⅱ #. Based on the analysis, the suggestion is also made for arrangement of drainage holes and installation of seepage pressure gauges.
作者 余国宏
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2001年第6期842-845,共4页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金资助项目(59734090).
关键词 引水隧洞 外水压力 仪器埋设 diversion tunnel, outer water pressure, monitoring, instrument installation
  • 相关文献

参考文献3

二级参考文献8

共引文献35

同被引文献17

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部