摘要
结合岩金矿山选矿厂碎磨工艺的设计实例和生产效果 ,提出了采用新技术、新工艺、新设备、优化碎磨工艺等设计思路 ,可以实现碎磨作业的“
Combining the design example and operation effects of pulverization technology of concentration plant in rock gold mine,this paper proposed to employ new technique and new equipment to optimize the design of pulverization on purpose of realization of 'more crushing than grinding'.
出处
《黄金》
CAS
2001年第12期35-38,共4页
Gold
关键词
碎磨
工艺设计
多碎少磨
优化设计
选矿
岩金矿山
pulverization technology
design
optimization
more crushing than grinding