摘要
对高炉热风主管、围管三叉口组合砖的设计计算进行了探讨和实践。
The design and calculation combined bricks in trident of main and round hot blast pipes on B.F. were studied and practiced.
出处
《河北冶金》
2001年第5期31-33,共3页
Hebei Metallurgy
关键词
高炉
热风管
组合砖
炼铁
blast furnace
hot blast pipe
combined brick