某住宅楼的地基加固与纠偏

THE REINFORCEMENT OF THE BASE AND RECTIFYING A DEVIATION OF THE RESIDENCD
下载PDF
导出
摘要 面对连云港市新浦区软土地基上施工的某住宅楼 ,施工时由于对北楼部分桩出现的缩颈及断裂未能妥善处理 ,造成楼房北倾的问题。经协商 ,及时采取了旋喷桩加固法加固北楼基础 :采用沉降法(切桩 )、纠偏 (使各承台均匀、协调、沉降 )、接桩、固封等措施 ,效果良好。 Revoving gush stakes were used immediately to reinforce the bases of the north part of the residence which was built on the soft groungwork ,Xinpu district ,Lianyungang city because the residence had tilted for the sake of the errors that had been made by the designer when he dealed with the stakes accidents such as crinkle and rupture?Goals had been achieved by taking several measures such as the sedimentation(cutting stakes)?rectifying the deviations (in order to make the caps of the stakes to sink with uniformity and harmony)?joining the stakes and reinforcements.
出处 《化工矿产地质》 CAS 2001年第2期125-127,共3页 Geology of Chemical Minerals
关键词 基础加固 纠偏 沉降 软土地基 住宅楼 旋喷桩 reinforcement of the base rectifying a deviation sedimentation soft groundwork
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部