摘要
针对水利水电工程施工中存在的多个料场给多个施工面供料的问题,提出了采用运筹学的线性规划原理进行优化调配,从而使工的经济效益达到最佳。
Because there are several stocking yards and supply material for several construction section, the linear programming is applied to optimize the dispatching processes in order to make the best benefits.
出处
《陕西水力发电》
2001年第3期33-35,共3页
Journal of Shaanxi Water Power
关键词
线性规划
料场
优化调配
水利水电工程
linear programming
stocking yards
optimization of dispatching