摘要
介绍了某水电站坝轴线、闸墩、水轮发电机组轴线的放样 。
The article introduces the laying-out of the axis of dam,pier and hydrogenerator,and the way to establish the net of control points of the power house.
出处
《浙江水利水电专科学校学报》
2001年第2期36-37,共2页
Journal of Zhejiang Water Conservancy and Hydropower College