介绍了在长安坝隧道出口特浅埋、偏压、软弱围岩段施工中采用地表锚杆、反压混凝土、小导管预注浆超前支护、三台阶分步开挖法、围岩监控量测等施工技术 ,较好地解决了施工中的难题 。
Difficult problems were well resolved during the construction of the super shallow buried Chang'anba Tunnel exit with unsymmetrical pressure and weak surrounding rock by using surface anchor bolt, addind covering concrete, small pilot tube pre\|grouting support, three\|bench tunneling method, and surrounding rock monitoring and surveying.some valuable experiences are obtained.
出处
《铁道建筑技术》
2001年第4期25-28,共4页
Railway Construction Technology
关键词
公路隧道
偏压
软弱围岩
监测
施工技术
出口段
highway tunnel,unsymmetrical pressure,weak surrounding rock,monitor ,construction