摘要
本文分析了影响磨矿钢球消耗的原因 ,结合生产实践进行技术研究 ;制定出降低钢球消耗的对策 ,对降低选矿作业成本有借鉴意义。
The article analyzes reason about effecting consumption of milling steel balls, does technical study combining production practice, establishes countermeasures to decrease consumption of steel balls and is use for reference for decreasing milling operation cost.
出处
《铜业工程》
CAS
2001年第3期42-45,共4页
Copper Engineering
关键词
钢球消耗
铜矿石
磨矿
选矿
成本
Steel ball Consumption of steel ball Case study Measure Countermeasure