摘要
本文介绍了海南千年塔施工质量监理中遇到的几个问题及其解决方法 ,并比较了灌注桩的水平变形比例系数m的试验值与规范推荐值的差别 ,以及对非垂直“T”形连接的全熔透焊缝和《工程建设强制性标准条文》
The author introduced some problems and their solution which were encountered during the construction of the Century Tower,and made a comparison between the experience value and the recommended normal value of the horizontal deformation proportion coefficient'm' of cast in place pile.The author also dealt with the penetrated butt weld of non vertical'T'shape connection,and discussed whether it was reasonable that some specific items were arranged in The Compulsory Provisions of Engineering Construction Standards.
出处
《海南大学学报(自然科学版)》
CAS
2001年第4期326-329,共4页
Natural Science Journal of Hainan University
关键词
千年塔结构
灌注桩
非垂直T形连接
全熔透焊缝
监理
施工质量
The Century Tower
structure
cast in place pile
non vertical'T'shape connection
penetrated butt weld
supervision