阳城500kV输电工程中串补装置的工作条件 被引量:8

Working Condition of Fixed Series Compensation in the Yangcheng 500 kV Transmission System
下载PDF
导出
摘要 用电磁暂态程序 (EMTP)模拟计算了阳城 5 0 0 k V输电工程串联电容器组的工作条件。结果表明 :线路正常投入串补电容器组 ,若永久性单相接地故障点靠近电容器组时单相自动重合闸 ,则串联电容器组有可能在 0 .35 s内不能得到可靠保护 ;距三堡母线 15 9.16 km以内线路发生三相接地故障时 ,串补电容器组才可在 0 .35 s内得到可靠保护。 The working condition of series compensation capacitor bank of Yangcheng 500kV transmission line is studied. The result shows if the series compensation capacitor bank is put into operation and the single phase recloser acts when the permanent single phase grounding fault is near the capacitor bank the series compensation capacitor bank can not be protected in 0.35s. The 3 phases grounding fault occurs within 159.16km from Sanbao line the series compensation capacitor bank can be reliably protected in 0.35s.
出处 《高电压技术》 EI CAS CSCD 北大核心 2001年第6期34-36,共3页 High Voltage Engineering
关键词 输电工程 输电线路 串联电容器补偿装置 金属氧化物变阻器 fixed series compensation(FSC) metal oxide varistor
  • 相关文献

参考文献3

共引文献8

同被引文献71

引证文献8

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部