复杂地质条件下微型嵌岩钢管灌注桩施工技术 被引量:1

Built-in Mini Steel Pipe Pile Construction Technique Under Complicated Geological Conditions
下载PDF
导出
摘要 钢管灌注桩施工是珠江堤岸环境改造工程沿江路人行道悬飘段工程的重点和难点,在施工过程中存在地质复杂、工期紧、工作面狭长、管理难度大等特点.本文通过介绍如何克服复杂地质条件下微型嵌岩钢管灌注桩施工的困难,深入阐述嵌岩钢管灌注桩的施工方法和技术. Steel pipe pile construction is the key and major part of the working operation to the suspended pavement section of Yanjian Road that is the part of the Pearl River embankment environmental improvement project. The build-ing site has complicated geoloical conditions, along with tight project period, narrow working face, and hard task man-agement. By introducing how to overcome the built-in mini steel pipe operation problems under complicated geological conditions, the paper deeply elaborates the built-in steel pipe pile construction techniques.
作者 张伟东
出处 《广州大学学报(综合版)》 2001年第11期65-68,共4页 Journal of Guangzhou University
关键词 珠江 堤岸 嵌岩钢管灌注桩 挡土墙 施工 环境改造 复杂地质条件 Pearl River embankment built-in steel pipe pile retaining wall
  • 相关文献

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部