摘要
青藏铁路施工中适当调整硫磺锚固砂浆配合比和适当改变生产工艺 ,在气温 -4 2 2℃~ 2 3
During construction of Qinghai Tibet Railway,properly adjusting proportioning of sulphuic anchor mortar and changing working technology shall meet the requirements specified by the Technical Specifications under conditions with temperature of -42\^2℃~23\^2℃.
出处
《混凝土》
CAS
CSCD
2001年第9期44-46,共3页
Concrete