摘要
结合工程实例 。
Combined with the project example,authors introduced construction method of hand dug hole of compaction fill soil under an excess of under\|groundwater condition,to meet some problems and treatment measures. \[
出处
《建筑技术开发》
2001年第10期8-9,40,共3页
Building Technology Development
关键词
井点降水
人工挖孔
水下混凝土
挖孔桩
工程施工
Well pipe ground\|water lowering
Artificial pile digging
Underwater concrete