摘要
广州恒宝华庭工程深基坑施工环境特别困难 ,尤其是临近地铁 ,对围护结构的变形要求严格控制 ;施工中采取了科学的工艺流程和多种技术措施 。
Deep foundation pit construction ambience of Hengbao Courtyard Engineering in Guangzhou,was very difficult,especially next to subways,which required controlling the deformation of exterior\|protected structure strictly.We adopted reasonable technological process and took multi\|technical measures,which protected the surrounding circumstances effectual,at the same time,we created better economic benefits and social advantages. \[
出处
《建筑技术开发》
2001年第12期11-12,33,共3页
Building Technology Development
关键词
逆作法
土方开挖
地基加固
现场监测
深基坑施工
Foundation pit supporting
Method of inverse construction
Earthwork excavation
Foundation reinforcement
Site investigation