摘要
珠海华银广场从±0.000~16.700m设置7根钢管混凝土柱。为达到设计要求 ,严格按技术要求及操作程序执行 ,钢管柱在工厂制作 ,施工中采取了一系列有利于提高混凝土密实度的技术措施。经敲击检测表明 :钢管内混凝土绝大部分密实 ,未发现异常情况。
Seven steel tube concrete columns were built in Huayin plaza project in Zhuhai with elevation from ±0.000~16.700 m.In order to meet design standard and strict technique requirement as well as operating rules,steel tubes were made in a plant.A series of technical measures facilitating concrete denseness were adopted.Knocking test showed that most part of concrete in the tube were dense without apparent defectiveness in it.
出处
《建筑技术》
北大核心
2001年第2期87-89,共3页
Architecture Technology
关键词
钢管混凝土
柱
制作
安装
质量检测
工程施工
steel tube concrete column
manufacture
installation
quality test