摘要
文章针对石家庄热电厂 10 0MWCFB锅炉燃烧脱硫试验出现的问题以及若干注意事项做了较为详尽的论述 。
Problems occurred in combustion desulfurization test of a 100 MW CFB boiler in Shijiazhuang Co-generation Power Plant and some precautions are discussed in detail. The correction recommendations of a part of the test results are also proposed.
出处
《河北电力技术》
2001年第6期34-35,共2页
Hebei Electric Power