摘要
南钢二烧多年来通过对两台烧结机进行技术改造 ,使烧结矿产量逐年提高 ,设备运行稳定 ,能耗下降 ,取得了明显的经济效益。
Since the commissioning of 2×24m 2 sintering plants in Nanjing I&S Co , the modifications were conducted continuously So that the sinter output was increased , running of the equipments became more smoother,the energy consumption was decreased year after year and the obvious benefit was obtained
出处
《烧结球团》
北大核心
2001年第4期52-54,共3页
Sintering and Pelletizing