土工格栅堆石进占筑坝施工技术

Analysis on Construction Techniques of Rock-fill Dammed with Soil Engineering Grills Occupied Progressively
下载PDF
导出
摘要 土工格栅堆石进占筑坝是利用土工格栅堆石与土工布袋装土代替传统的柳石进占体。利用该技术筑坝工艺简单、结构合理、施工进度快、安全性能好、工程造价低。菏泽市黄河河务局于 2 0 0 0年汛前首次在黄河下游用土工格栅堆石进占技术修筑了杨集险工上延 9~ 10号坝。在施工中技术人员根据施工边界条件变化 ,采用了合理的施工工艺和流程 ,收到了良好的效果。 The rock-fill structure with soil engineering grills occupied progressively is to use rock filling with soil engineering grills and soils filled with geo-textile sacks instead of traditional body occupied progressively with willow stone. The structure has characteristics with simple technology, rational structure, quick construction tempo, good safe property and low cost of project. Yellow River Heze Bureau had built 9~10# dams extended above Yangji vulnerable spot using techniques of rock-fill occupation with soil engineering grills in the Lower Yellow River first before flood period in 2000. According to the variation of boundary conditions under the construction, the technical personnel adopted rational construction technology and technological process, and achieved good results.
出处 《人民黄河》 CAS 北大核心 2001年第9期26-27,共2页 Yellow River
基金 黄河水利委员会科技资助项目 ( 98B0 1) 山东黄河河务局资助防汛抢险科技项目 ( 98HGF -6 6 )
关键词 土工格栅 堆石 土工布袋 筑坝技术 进占 soil engineering grills rock filling geo-textile sacks occupied progressively dam bank project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部