期刊文献+

“梯级管井降水”在人工挖孔护坡桩工程中的应用

Dewatering By Rung Tube Well" Applied in the Project of Abundant Water and Petehing Pile By Digging Holes Artificially in Deep Foundation Pit
下载PDF
导出
摘要 阐述利用“梯级管井降水”方案 ,成功安全实现在厚度大砂卵石砾石强富水的深基坑及人工挖孔护坡桩干槽施工作业 。 This paper has expatiated upon the plan of 'dewatering by rung tube well', which not only achieve safely and successfully the construction opration in abundant water and deep foundation pit by digging holes artificially, but also tackle the key difficulty of dewatering in deep foundation pit in the construction.
出处 《西部探矿工程》 CAS 2001年第4期12-14,共3页 West-China Exploration Engineering
关键词 梯级管井降水 深基坑 人工挖孔护坡桩 水跃值 地下水 dewatering by rung tube well abundant water deep foundation pit pitching pile by digging holes artificially entrance drop
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部