摘要
介绍地铁施工时 。
This paper introduces the mechanism and method of the pile foundations reinforcement, which is carried out by means of grouting during metor construction, for the surface buildings close to the metro tunnels.
出处
《西部探矿工程》
CAS
2001年第4期74-76,共3页
West-China Exploration Engineering