摘要
本文总结了莆田市邮政大楼工程的电梯井道、剪力墙主体结构施工中轴线的放线、传递方法。
The paper describes the main points on the quality control in centerline laying,transmit method,vertical degrees,formwork setting in construction of Shearing force wall and shaft of lift in Putian City Post Building Project.
出处
《福建建筑》
2002年第1期58-60,共3页
Fujian Architecture & Construction