摘要
太原市呼延水厂是“引黄入并”工程的重点配套项目 ,也是太原市第一个大型地面水处理厂 ,工程总设计规模为 190万m3 /d ,其中近期规模为 80万m3 /d。简要介绍了水厂的净水工艺流程、水质目标、各净水构筑物的主要设计参数、设备配置以及各种药剂的投加系统、控制方式等内容 。
Huyan Waterworks, the biggest waterworks receiving surface water in Taiyuan City, Shanxi Province with ultimate design capacity of 1 9 (near term of 0 8) million m 3/d is one of main projects of the Yellow River Water Diverting Engineering to Taiyuan. The main figure of this project including the water purification process, expected quality of output water, design parameters of water purification structures, equipment allocation, chemical dosage system and automatic control are presented in detail in this paper. Also some particularities in process design and equipment configuration are discussed.
出处
《给水排水》
CSCD
北大核心
2002年第1期4-7,共4页
Water & Wastewater Engineering