期刊文献+

Box-Cox变换的黄金分割法实现 被引量:3

Golden section search for actualizing Box-Cox transformation
下载PDF
导出
摘要 提出可以使用黄金分割法确定 Box- Cox变换中的参数 ,给出了一种计算步骤。提出了通过多搜索几个区间和回归诊断来更大限度地保证所确定出的参数是合用的。并从理论分析和实例检验两方面说明了与一维格点搜索法相比 ,使用黄金分割法确定 Box- Cox变换中的参数计算量较小 ,容易使计算结果达到较高的精确度 ,且易用性也有所提高。 This paper brings up that golden section search can be used to search for the parameter in Box Cox transformation and offers a kind of steps in computing it.By searching for the parameter in more sections and using regression diagnosis,the established parameter is ensured to be more suitable.Theoretical analysis and experiments show:comparing with a dimension lattice search,the searching for the parameter in Box Cox transformation by golden section search has less calculation,and it is easy to get more accurate result and is more applicable.
出处 《西北农林科技大学学报(自然科学版)》 CSCD 北大核心 2001年第4期125-127,共3页 Journal of Northwest A&F University(Natural Science Edition)
关键词 线性回归 Box-Cox变换 一维格点搜索法 黄金分割法 参数确定 linear regression Box Cox transformation a dimension lattice search golden section search
  • 相关文献

参考文献7

  • 1张宜华.精通MATLAB5[M].北京:清华大学出版社,1999..
  • 2William H G.经济计量学[M].北京:中国社会科学出版社,1998..
  • 3李选举.Box-Cox变换及其在MathCAD上的实现[J].数量经济技术经济研究,2000,17(4):42-44. 被引量:5
  • 4张宜华,精通MATLAB 5,1999年
  • 5William H G,经济计量学,1998年
  • 6周纪芗,回归分析,1993年
  • 7薛嘉庆,最优化原理与方法,1983年

二级参考文献3

  • 1纪哲锐,MathCAD PLUS 6.0快速入门及应用,1998年
  • 2Weisberg S,应用线性回归,1998年
  • 3周纪芗,回归分析,1993年

共引文献83

同被引文献18

  • 1施小清,吴吉春,袁永生.渗透系数空间变异性研究[J].水科学进展,2005,16(2):210-215. 被引量:60
  • 2陈彦,吴吉春.含水层渗透系数空间变异性对地下水数值模拟的影响[J].水科学进展,2005,16(4):482-487. 被引量:52
  • 3施小清,吴吉春,袁永生,姜蓓蕾.含水介质各向异性对渗透系数空间变异性统计的影响[J].水科学进展,2005,16(5):679-684. 被引量:14
  • 4袁志发.概率基础与数理统计[M].北京:农业出版社,1987..
  • 5Arditi D. Construction cost estimating support system [ J ]. Cost Engineering, 2002,44 (10) : 17 - 25.
  • 6Tas E. A building cost estimation model based on cost significant work packages[J]. Engineering Construction and Architectural Management, 2005,12(3) : 251 - 263.
  • 7Morris M R. Improving the accuracy of early cost - estimates for federal construction projects[M]. Washington D.C. Building Research Board, National Research Council, 1990:7- 14.
  • 8Bowlby Roger L, Schriver William R. Observations on productivity and composition of building construction output in the united states[J]. Construction Management and Economics, 1996,4(1) : 1 - 18.
  • 9Yang I Y. Simulation- based estimation for correlated eost elements[J]. International Journal of Project Management, 2005 (23) :275 - 282.
  • 10Kan Phaobunjong. Parametric cost estimating model for conceptual cost estimating of building construction projects[D]. Dissertation presented to the university of texas at austin in partial fulfillment of the requirements for the degree of Doctor of Philosophy, 2002.

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部