期刊文献+

当前工程建设中存在的问题及对策 被引量:1

下载PDF
导出
作者 蒋建华
机构地区 义乌市审计局
出处 《浙江审计》 2002年第1期39-40,共2页
  • 相关文献

同被引文献10

  • 1Construction Industry Institute. In search of Partnering excellence [M]. The U.S.: Construction Industry Development Agency,1991.
  • 2Susan Bogus, James E. Diekmann, Keith R. Molenaar. A Methodology to Reconfigure the Design-Construction Interface for Fast-Track Projects--Computing in Civil Engineering [C]. Washington, D.C: ASCE Conf. Proc, 2002:258-272.
  • 3CSI. The project resource manual : CSI manual of practice[M].The Construetion Specifieations Institute. New York: MeGraw- Hill, 2005.
  • 4Roberto Pietroforte,1 Associate Member. Shop Drawing Process of Stone Veneered Cladding Systems [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 1997,3(2):70-79.
  • 5William W. Edgerton,John T. MacDermott. The three-category submittal review process[M]. Jacobs Associutes, Sun Francisco, Calg, US, 1996.
  • 6EHKA,A Inc. COORDINATION DRAWING GUIDELINES[R]. EHK Adjorlolo & Associates.
  • 7国际咨询工程师联合会 中国工程咨询协会编译.施工合同条件[M].北京:机械工业出版社,2002..
  • 8唐文哲,强茂山,陆佑楣,陈云华,彭青峰.建设业伙伴关系管理模式研究[J].水力发电,2008,34(3):9-13. 被引量:17
  • 9李德全,郑翔.我国建筑业设计施工一体化发展研究[J].建筑,2009(7):30-35. 被引量:13
  • 10王俊才,洪红,廖奇云.建设工程项目的发包方式——设计-施工一体化承包模式的应用研究[J].重庆建筑大学学报,2003,25(6):108-114. 被引量:14

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部