摘要
针对目前我国石化行业大型机组自控工程设计、选型的实际情况 ,结合作者的施工经验 ,总结了大型机组自控工程安装、调试的方法。重点介绍了大型机组特殊仪表的安装及特殊控制系统的调试 ,并以苏丹
In connection with the present actual situation of the design & type slection for an automatic control project on the heavy units in our country petrochemical industry and combination with the writer's construction experience, this paper summarized the installation & test run methods of an automatic control project on the heavy units. The installation of some special instruments & the test run of some special control systems on the heavy units were emphatically introduced. By taking the flue gas generator on a 180×l0 4t/a catalytic cracking unit in Sudan as an example, this paper expounded the dynamic modeling test method before the units are started up.
出处
《石油工程建设》
北大核心
2001年第6期16-19,共4页
Petroleum Engineering Construction