摘要
重点论述了施工企业只有在工程投标、项目实施、工程竣工结算阶段将工程项目管理与施工组织设计及实施有机结合 。
This paper discusses emphatically on that only when the construction enterprises practice organic combination of engineering construction management with construction organization and implementation in the phases of engineering tender,project implementation,engineering completion and settle accounts,and analyze and guide the construction through construction cost analysis, can the better economic benefits be obtained.
出处
《科技情报开发与经济》
2001年第6期119-120,共2页
Sci-Tech Information Development & Economy