摘要
结合国道 32 4线云浮段路基工程 ,通过对挡土结构的方案比较 ,着重讨论钢筋混凝土锚定板挡土结构在路基工程特定条件下的设计与施工 。
The design and construction of the reinforced concrete anchored plate retaining structure in the subgrade engineering under the special conditions is mainly discussed combined with National Highway 324 Route Yunfu section subgrade project and through scheme comparison of the retaining structure.The practice has demonstrated this is a method of favorable technology and rational economy.
出处
《广东工业大学学报》
CAS
2001年第4期55-58,共4页
Journal of Guangdong University of Technology