摘要
姚河坝水电站以水库代替沉沙池进行沉沙和冲沙 ,可取消地下沉沙池。通过改变水库运用方式 ,合理控制水库泥沙淤积和泄空水库冲沙 。
By adopting reservior instead of pond for trapping an d flushing sand, the desilting pond of the Yaoheba hydropower station can be can celed. The long-term valid regulating storage required by design can be ensured by modifying the reservoir operation mode, rationally controlling silt depo sit and drawing down reservoir level for flushing silt.
出处
《西北水电》
2001年第3期11-13,17,共4页
Northwest Hydropower