摘要
结合某大桥钻孔桩的施工工艺、静载试验、高应变试验和取芯检验等资料 ,分析了钻孔桩承载力偏低的原因 。
Based on the information of construction technology, static load test, high strain test and cored test, the cause of bored pile low bearing capacity is analyzed, and the treatment is presented.
出处
《桥梁建设》
EI
CSCD
北大核心
2001年第6期58-61,共4页
Bridge Construction